Finance Company / London Bridge
Project Size: 5,000 sq ft.
Duration of Project : 8 weeks
This was a 5000 sq ft 8 Week project in London Bridge within an existing listed building
This was a CAT B fit out in which CBL were responsible for the design, install & commissioning of the following systems.
Due to the status of the building and the lack of ceiling and floor depth all services had to be installed surface in galvanised containment and set out to ensure it was aesthetically pleasing for the client.
-
Underfloor Power Track
-
Desk Power
-
Lighting Installation
-
Lighting Control
-
Emergency Lighting
-
Leak Detection System
-
Access Control System
-
Data Wiring & Installation
Related Projects
Project Size: 10,000 sq ft. Duration of Project : 12 weeks
Project Size: 5,286 sq ft. Project Value: £160K Duration of Project : 10 weeks
Project Size: 1,582 sq ft. Project Value: £90K Duration of Project : 10 weeks
Project Size: 5,000 sq ft. Duration of Project : 8 weeks
Project Size: 9,000 sq ft. Duration of Project : 12 weeks