Finance Company / London Bridge

Project Size: 5,000 sq ft.

Duration of Project : 8 weeks

london-bridge-feature.jpg
Anchor 1

This was a 5000 sq ft 8 Week project in London Bridge within an existing listed building

This was a CAT B fit out in which CBL were responsible for the design, install & commissioning of the following systems.

Due to the status of the building and the lack of ceiling and floor depth all services had to be installed surface in galvanised containment and set out to ensure it was aesthetically pleasing for the client.

  • Underfloor Power Track

  • Desk Power

  • Lighting Installation

  • Lighting Control

  • Emergency Lighting

  • Leak Detection System

  • Access Control System

  • Data Wiring & Installation