Project Size: 9000 sq ft.

Duration of Project : 24 weeks

brioni-feature.jpg
Anchor 1

This 9,000 sq ft project was carried out over 24 weeks in five Separate phases over 6no. Floors due to the client’s requirements to continue trading.

The store was completely re-wired from top to bottom and CBL were involved in the design process. The systems covered in this install were as below;

  • Distribution & Metering

  • Lighting Install & Lighting Control System

  • Emergency Lighting

  • Small Power

  • Data Install

  • CCTV / Intruder Alarm / Access Control

  • Fire Alarm System